/[MITgcm]/www.ecco-group.org/index.htm
ViewVC logotype

Diff of /www.ecco-group.org/index.htm

Parent Directory Parent Directory | Revision Log Revision Log | View Revision Graph Revision Graph | View Patch Patch

revision 1.12 by heimbach, Tue May 3 01:13:10 2016 UTC revision 1.13 by heimbach, Thu Jun 22 03:38:05 2017 UTC
# Line 119  body { Line 119  body {
119        <tr>        <tr>
120          <td bgcolor="#FFFFFF" class="homepagetitles">&nbsp;</td>          <td bgcolor="#FFFFFF" class="homepagetitles">&nbsp;</td>
121          <td height="70" colspan="5" valign="top" bgcolor="#FFFFFF">          <td height="70" colspan="5" valign="top" bgcolor="#FFFFFF">
122              <p><strong><br />June 2017: A new 20-yr ECCO climatology is now available online:</strong></p>
123              <p>ECCO version 4 has been used to calculate a uniform 20-year climatology as a time-mean over the period 1994-2013. The climatology is readily accessible as <a href="http://mit.ecco-group.org/opendap/diana/h8_i48/contents.html" target="blank">Matlab files</a>.
124    Associated pictorial atlas and descriptions are available in the DSpace@MIT ECCO Community Collection long-term archive. So far these include:
125    <ul>
126    <li>A Twenty-Year Dynamical Oceanic Climatology: 1994-2013. Part 1: Active Scalar Fields: Temperature, Salinity, Dynamic Topography, Mixed-Layer Depth, Bottom Pressure. <a href="http://hdl.handle.net/1721.1/107613" target="blank">http://hdl.handle.net/1721.1/107613</a> (2017-03-20)</li>
127    
128    <li>A Twenty-Year Dynamical Oceanic Climatology: 1994-2013. Part 2: Velocities, Property Transports, Meteorological Variables, Mixing Coefficients. <a href="http://hdl.handle.net/1721.1/109847" target="blank">http://hdl.handle.net/1721.1/109847</a> (2017-06-14)</li>
129    </ul>
130    
131            <p><strong><br />May 2016: Joint ECCO-Production and ECCO-IcES Meeting at MIT:</strong></p>            <p><strong><br />May 2016: Joint ECCO-Production and ECCO-IcES Meeting at MIT:</strong></p>
132            <p>The ECCO-Production and ECCO-IcES groups will hold a joint project meeting at MIT from 16-18 May 2016. A <a href="http://www.ecco-group.org/meetings/2016-mit/" target="blank">preliminary meeting agenda is now available online</a>. Please watch this space for updates.            <p>The ECCO-Production and ECCO-IcES groups will hold a joint project meeting at MIT from 16-18 May 2016. A <a href="http://www.ecco-group.org/meetings/2016-mit/" target="blank">preliminary meeting agenda is now available online</a>.
133  <br>  <br>
134  <br>  <br>
135            <p><strong><br />Mar 2016: ECCO version 4, release 2 (ECCO v4-r2) now available online</strong></p>            <p><strong><br />Mar 2016: ECCO version 4, release 2 (ECCO v4-r2) now available online</strong></p>

Legend:
Removed from v.1.12  
changed lines
  Added in v.1.13

  ViewVC Help
Powered by ViewVC 1.1.22