| 1 | 
\subsection{CAL: The calendar package | 
| 2 | 
\label{sectioncal}} | 
| 3 | 
\begin{rawhtml} | 
| 4 | 
<!-- CMIREDIR:sectioncal: --> | 
| 5 | 
\end{rawhtml} | 
| 6 | 
 | 
| 7 | 
\textit{Christian Eckert, MIT/EAPS, May-2000} | 
| 8 | 
 | 
| 9 | 
This calendar tool was originally intended to enable the use of | 
| 10 | 
absolute dates (Gregorian Calendar dates) in the ocean general | 
| 11 | 
circulation model MITgcmuv. There is, however, a fair amount of | 
| 12 | 
routines that can be used independently of the MITgcmuv. After | 
| 13 | 
some minor modifications the whole package can be used either | 
| 14 | 
as a stand-alone calendar or in connection with any dynamical | 
| 15 | 
model that needs calendar dates. Some straightforward extensions | 
| 16 | 
are still pending e.g. the availability of the Julian Calendar, | 
| 17 | 
to be able to resolve fractions of a second, and to have a time- | 
| 18 | 
step that is longer than one day. | 
| 19 | 
 | 
| 20 | 
\subsubsection{Basic assumptions for the calendar tool} | 
| 21 | 
 | 
| 22 | 
    It is assumed that the SMALLEST TIME INTERVAL to be resolved is | 
| 23 | 
    ONE SECOND. | 
| 24 | 
 | 
| 25 | 
    Further assumptions are that there is an INTEGER NUMBER OF | 
| 26 | 
    MODEL STEPS EACH DAY, and that AT LEAST ONE STEP EACH DAY is | 
| 27 | 
    made. | 
| 28 | 
 | 
| 29 | 
    Not each individual routine depends on these assumptions; there | 
| 30 | 
    are only a few places where they enter. | 
| 31 | 
 | 
| 32 | 
\subsubsection{Format of calendar dates} | 
| 33 | 
 | 
| 34 | 
    In this calendar tool a complete date specification is defined | 
| 35 | 
    as the following integer array: | 
| 36 | 
 | 
| 37 | 
\begin{verbatim} | 
| 38 | 
c           integer date(4) | 
| 39 | 
c | 
| 40 | 
c           ( yyyymmdd, hhmmss, leap_year, dayofweek ) | 
| 41 | 
c | 
| 42 | 
c             date(1) = yyyymmdd    <-- Year-Month-Day | 
| 43 | 
c             date(2) =   hhmmss    <-- Hours-Minutes-Seconds | 
| 44 | 
c             date(3) = leap_year   <-- Leap Year/No Leap Year | 
| 45 | 
c             date(4) = dayofweek   <-- Day of the Week | 
| 46 | 
c | 
| 47 | 
c             leap_year is either equal to 1 (normal year) | 
| 48 | 
c                              or equal to 2 (leap year) | 
| 49 | 
c | 
| 50 | 
c             dayofweek has a range of 1 to 7. | 
| 51 | 
\end{verbatim} | 
| 52 | 
 | 
| 53 | 
          In case the Gregorian Calendar is used, the first | 
| 54 | 
          day of the week is Friday, since day of the Gregorian | 
| 55 | 
          Calendar was Friday, 15 Oct. 1582. As a date array | 
| 56 | 
          this date would be specified as | 
| 57 | 
 | 
| 58 | 
\begin{verbatim} | 
| 59 | 
c               refdate(1) = 15821015 | 
| 60 | 
c               refdate(2) =        0 | 
| 61 | 
c               refdate(3) =        1 | 
| 62 | 
c               refdate(4) =        1 | 
| 63 | 
\end{verbatim} | 
| 64 | 
 | 
| 65 | 
\subsubsection{Calendar dates and time intervals} | 
| 66 | 
 | 
| 67 | 
    Subtracting calendar dates yields time intervals. | 
| 68 | 
    Time intervals have the following format: | 
| 69 | 
 | 
| 70 | 
\begin{verbatim} | 
| 71 | 
c         integer datediff(4) | 
| 72 | 
c | 
| 73 | 
c           datediff(1) = # Days | 
| 74 | 
c           datediff(2) = hhmmss | 
| 75 | 
c           datediff(3) =      0 | 
| 76 | 
c           datediff(4) =     -1 | 
| 77 | 
\end{verbatim} | 
| 78 | 
 | 
| 79 | 
    Such time intervals can be added to or can be subtracted from | 
| 80 | 
    calendar dates. Time intervals can be added to and be | 
| 81 | 
    subtracted from each other. | 
| 82 | 
 | 
| 83 | 
\subsubsection{Using the calendar together with MITgcm} | 
| 84 | 
 | 
| 85 | 
    Each routine has as an argument the thread number that it is | 
| 86 | 
    belonging to, even if this number is not used in the routine | 
| 87 | 
    itself. | 
| 88 | 
 | 
| 89 | 
    In order to include the calendar tool into the MITgcm | 
| 90 | 
    setup the MITgcm subroutine "initialise.F" or the routine | 
| 91 | 
    "initilise\_fixed.F", depending on the MITgcm release, has | 
| 92 | 
    to be modified in the following way: | 
| 93 | 
 | 
| 94 | 
{\footnotesize | 
| 95 | 
\begin{verbatim} | 
| 96 | 
c         #ifdef ALLOW_CALENDAR | 
| 97 | 
c         C--   Initialise the calendar package. | 
| 98 | 
c         #ifdef USE_CAL_NENDITER | 
| 99 | 
c               CALL cal_Init( | 
| 100 | 
c              I               startTime, | 
| 101 | 
c              I               endTime, | 
| 102 | 
c              I               deltaTclock, | 
| 103 | 
c              I               nIter0, | 
| 104 | 
c              I               nEndIter, | 
| 105 | 
c              I               nTimeSteps, | 
| 106 | 
c              I               myThid | 
| 107 | 
c              &             ) | 
| 108 | 
c         #else | 
| 109 | 
c               CALL cal_Init( | 
| 110 | 
c              I               startTime, | 
| 111 | 
c              I               endTime, | 
| 112 | 
c              I               deltaTclock, | 
| 113 | 
c              I               nIter0, | 
| 114 | 
c              I               nTimeSteps, | 
| 115 | 
c              I               myThid | 
| 116 | 
c              &             ) | 
| 117 | 
c         #endif | 
| 118 | 
c               _BARRIER | 
| 119 | 
c         #endif | 
| 120 | 
\end{verbatim} | 
| 121 | 
} | 
| 122 | 
 | 
| 123 | 
    It is useful to have the CPP flag ALLOW\_CALENDAR in | 
| 124 | 
    order to switch from the usual MITgcm setup to the | 
| 125 | 
    one that includes the calendar tool. The CPP flag | 
| 126 | 
    USE\_CAL\_NENDITER has been introduced in order to enable | 
| 127 | 
    the use of the calendar for MITgcm releases earlier | 
| 128 | 
    than checkpoint 25 which do not have the global variable | 
| 129 | 
    *nEndIter*. | 
| 130 | 
 | 
| 131 | 
\subsubsection{The individual calendars} | 
| 132 | 
 | 
| 133 | 
Simple model calendar: | 
| 134 | 
 | 
| 135 | 
          This calendar can be used by defining | 
| 136 | 
 | 
| 137 | 
\begin{verbatim} | 
| 138 | 
c                  TheCalendar='model' | 
| 139 | 
\end{verbatim} | 
| 140 | 
 | 
| 141 | 
          in the calendar's data file "data.cal". | 
| 142 | 
 | 
| 143 | 
          In this case a year is assumed to have 360 days. The | 
| 144 | 
          model year is divided into 12 months with 30 days each. | 
| 145 | 
 | 
| 146 | 
Gregorian Calendar: | 
| 147 | 
 | 
| 148 | 
          This calendar can be used by defining | 
| 149 | 
 | 
| 150 | 
\begin{verbatim} | 
| 151 | 
c                  TheCalendar='gregorian' | 
| 152 | 
\end{verbatim} | 
| 153 | 
 | 
| 154 | 
          in the calendar's data file "data.cal". | 
| 155 | 
 | 
| 156 | 
\subsubsection{Short routine description} | 
| 157 | 
 | 
| 158 | 
{\footnotesize | 
| 159 | 
\begin{verbatim} | 
| 160 | 
c      o  cal_Init          - Initialise the calendar. This is the interface | 
| 161 | 
c                             to the MITgcm. | 
| 162 | 
c | 
| 163 | 
c      o  cal_Set           - Sets the calendar according to the user | 
| 164 | 
c                             specifications. | 
| 165 | 
c | 
| 166 | 
c      o  cal_GetDate       - Given the model's current timestep or the | 
| 167 | 
c                             model's current time return the corresponding | 
| 168 | 
c                             calendar date. | 
| 169 | 
c | 
| 170 | 
c      o  cal_FullDate      - Complete a date specification (leap year and | 
| 171 | 
c                             day of the week). | 
| 172 | 
c | 
| 173 | 
c      o  cal_IsLeap        - Determine whether a given year is a leap year. | 
| 174 | 
c | 
| 175 | 
c      o  cal_TimePassed    - Determine the time passed between two dates. | 
| 176 | 
c | 
| 177 | 
c      o  cal_AddTime       - Add a time interval either to a time interval | 
| 178 | 
c                             or to a date. | 
| 179 | 
c | 
| 180 | 
c      o  cal_TimeInterval  - Given a time interval return the corresponding | 
| 181 | 
c                             date array. | 
| 182 | 
c | 
| 183 | 
c      o  cal_SubDates      - Determine the time interval between two dates | 
| 184 | 
c                             or between two time intervals. | 
| 185 | 
c | 
| 186 | 
c      o  cal_ConvDate      - Decompose a date array or a time interval | 
| 187 | 
c                             array into its components. | 
| 188 | 
c | 
| 189 | 
c      o  cal_CopyDate      - Copy a date array or a time interval array to | 
| 190 | 
c                             another array. | 
| 191 | 
c | 
| 192 | 
c      o  cal_CompDates     - Compare two calendar dates or time intervals.  | 
| 193 | 
c | 
| 194 | 
c      o  cal_ToSeconds     - Given a time interval array return the number | 
| 195 | 
c                             of seconds. | 
| 196 | 
c | 
| 197 | 
c      o  cal_WeekDay       - Return the weekday as a string given the | 
| 198 | 
c                             calendar date. | 
| 199 | 
c | 
| 200 | 
c      o  cal_NumInts       - Return the number of time intervals between two | 
| 201 | 
c                             given dates. | 
| 202 | 
c | 
| 203 | 
c      o  cal_StepsPerDay   - Given an iteration number or the current | 
| 204 | 
c                             integration time return the number of time | 
| 205 | 
c                             steps to integrate in the current calendar day. | 
| 206 | 
c | 
| 207 | 
c      o  cal_DaysPerMonth  - Given an iteration number or the current | 
| 208 | 
c                             integration time return the number of days | 
| 209 | 
c                             to integrate in this calendar month. | 
| 210 | 
c | 
| 211 | 
c      o  cal_MonthsPerYear - Given an iteration number or the current | 
| 212 | 
c                             integration time return the number of months | 
| 213 | 
c                             to integrate in the current calendar year. | 
| 214 | 
c | 
| 215 | 
c      o  cal_StepsForDay   - Given the integration day return the number | 
| 216 | 
c                             of steps to be integrated, the first step, | 
| 217 | 
c                             and the last step in the day specified. The | 
| 218 | 
c                             first and the last step refer to the total | 
| 219 | 
c                             number of steps (1, ... , cal_IntSteps). | 
| 220 | 
c | 
| 221 | 
c      o  cal_DaysForMonth  - Given the integration month return the number | 
| 222 | 
c                             of days to be integrated, the first day, | 
| 223 | 
c                             and the last day in the month specified. The | 
| 224 | 
c                             first and the last day refer to the total | 
| 225 | 
c                             number of steps (1, ... , cal_IntDays). | 
| 226 | 
c | 
| 227 | 
c      o  cal_MonthsForYear - Given the integration year return the number | 
| 228 | 
c                             of months to be integrated, the first month, | 
| 229 | 
c                             and the last month in the year specified. The | 
| 230 | 
c                             first and the last step refer to the total | 
| 231 | 
c                             number of steps (1, ... , cal_IntMonths). | 
| 232 | 
c | 
| 233 | 
c      o  cal_Intsteps      - Return the number of calendar years that are | 
| 234 | 
c                             affected by the current integration. | 
| 235 | 
c | 
| 236 | 
c      o  cal_IntDays       - Return the number of calendar days that are | 
| 237 | 
c                             affected by the current integration. | 
| 238 | 
c | 
| 239 | 
c      o  cal_IntMonths     - Return the number of calendar months that are | 
| 240 | 
c                             affected by the current integration. | 
| 241 | 
c | 
| 242 | 
c      o  cal_IntYears      - Return the number of calendar years that are | 
| 243 | 
c                             affected by the current integration. | 
| 244 | 
c | 
| 245 | 
c      o  cal_nStepDay      - Return the number of time steps that can be | 
| 246 | 
c                             performed during one calendar day. | 
| 247 | 
c | 
| 248 | 
c      o  cal_CheckDate     - Do some simple checks on a date array or on a | 
| 249 | 
c                             time interval array. | 
| 250 | 
c | 
| 251 | 
c      o  cal_PrintError    - Print error messages according to the flags | 
| 252 | 
c                             raised by the calendar routines. | 
| 253 | 
c | 
| 254 | 
c      o  cal_PrintDate     - Print a date array in some format suitable for | 
| 255 | 
c                             the MITgcmuv's protocol output. | 
| 256 | 
c | 
| 257 | 
c      o  cal_TimeStamp     - Given the time and the iteration number return | 
| 258 | 
c                             the date and print all the above numbers. | 
| 259 | 
c | 
| 260 | 
c      o  cal_Summary       - List all the setttings of the calendar tool. | 
| 261 | 
\end{verbatim} | 
| 262 | 
} | 
| 263 | 
 |