/[MITgcm]/manual/s_ecco/text/ecco_costfunction.tex
ViewVC logotype

Contents of /manual/s_ecco/text/ecco_costfunction.tex

Parent Directory Parent Directory | Revision Log Revision Log | View Revision Graph Revision Graph


Revision 1.1 - (show annotations) (download) (as text)
Tue May 11 21:55:14 2004 UTC (21 years, 2 months ago) by heimbach
Branch: MAIN
File MIME type: application/x-tex
update

1 \section{The ECCO state estimation cost function DRAFT!!!
2 \label{sectioneccocost}}
3
4 The current ECCO state estimation covers an $nYears = 11$ year
5 model trajectory.
6 A variety of data sets enter a least squares cost function,
7 in addition to penalty terms which constrain deviations
8 of control variables beyound their a priori errors.
9
10 \subsection{Sea surface height from TOPEX/Poseidon and ERS-1/2 altimetry}
11
12 Altimetric SSH contributions from T/P and ERS-1/2 are four-fold:
13 %
14 \begin{enumerate}
15 %
16 \item
17 an $nYears$ time mean SSH misfit between
18 model and T/P
19 %
20 \item
21 daily SSH anomaly misfits between T/P and model
22 %
23 \item
24 daily SSH anomaly misfits between ERS-1/2 and model
25 %
26 \item
27 daily absolute SSH misfit between T/P and model,
28 weighted by the full geoid error covariance.
29 %
30 \end{enumerate}
31
32 \subsubsection{Input fields}
33 ~
34
35 \begin{table}[h!]
36 \begin{center}
37 \begin{tabular}{lllc}
38 \hline \hline
39 ~&~&~&~\\
40 field & file name & deccription & unit \\
41 ~&~&~&~\\
42 \hline
43 ~&~&~&~\\
44 {\it psbar} & {\tt psbarfile} & daily model mean SSH fields & [m] \\
45 {\it tpmean} & {\tt topexmeanfile} & $nYears$ T/P mean & [cm] \\
46 {\it tpobs} & {\tt topexfile} & daily T/P SSH anomalies & [cm] \\
47 {\it erspobs} & {\tt ersfile} & daily ERS-1/2 SSH anomalies & [cm] \\
48 {\it wp} & {\tt geoid\_errfile} & diagonal of geoid error covariance & [m] \\
49 {\it wtp, wers} & {\tt ssh\_errfile} & rms of SSH anomalies & [cm] \\
50 ~&~&~&~\\
51 \hline \hline
52 \end{tabular}
53 \end{center}
54 \end{table}
55
56
57 \subsubsection{$nYears$ time mean SSH misfit}
58
59 \begin{enumerate}
60 %
61 \item
62 Compute 11yr model mean spatial distribution
63 %
64 \begin{equation}
65 psmean(i,j)\, =\,
66 \frac{1}{nDaysRec} \sum_{i=1}^{nDaysRec}
67 psbar(i,j)
68 \end{equation}
69 %
70 \item
71 Compute global offset between 11-yr model and T/P mean:
72 %
73 \begin{equation}
74 \begin{split}
75 offset & = \, \overline{tpmean} \, - \, \overline{psmean} \\
76 ~ & = \, \frac{1}{normaliz.} \sum_{i,j}
77 \left\{ tpmean(i,j) \, - \, psmean(i,j) \right\}
78 \cdot cosphi(i,j) \cdot tpmeanmask(i,j)
79 \end{split}
80 \end{equation}
81 %
82 \item
83 Misfits are computed w.r.t. global $offset$.
84 \\
85 First spatial distribution:
86 %
87 \begin{equation}
88 \begin{split}
89 cost\_ssh\_mean(i,j) & = \,
90 \frac{1}{wp^2} \left\{ \,
91 \left[ \, psmean(i,j) - \overline{psmean} \, \right] \, - \,
92 \left[ \, tpmean(i,j) - \overline{tpmean} \, \right] \, \right\}^2 \\
93 ~ & = \, \frac{1}{wp^2} \left\{ \,
94 psmean(i,j) \, - \, tpmean(i,j) \, + \, offset \, \right\}^2
95 \end{split}
96 \end{equation}
97
98 %
99 Finally, sum over all spatial entries:
100 \begin{equation}
101 \overline{cost\_ssh\_mean} \, = \,
102 \sum_{i,j} cost\_ssh\_mean(i,j)
103 \end{equation}
104
105
106
107 \end{enumerate}
108
109 \subsubsection{Misfit of daily SSH anomalies}
110
111 Computation is same for T/P and ERS-1/2.
112 Here we write out computation for T/P.
113
114 \begin{enumerate}
115 %
116 \item
117 Compute difference in anomalies:
118
119 \begin{equation}
120 \begin{split}
121 cost\_ssh\_anom(i,j,t) & = \, \frac{1}{wtp^2} \left\{ \,
122 \left[ \, psbar(i,j,t) - psmean(i,j) \, \right] \, - \,
123 \left[ \, tpobs(i,j,t) \, \right] \,
124 \right\}^2
125 \end{split}
126 \end{equation}
127 %
128 where $t$ denotes time (day) index, and
129 where it is assumed that $ nYears$ mean T/P spatial distribution
130 $tpmean(i,j)$ has already been removed from data $tpobs(i,j)$!
131
132 \item
133 Sum over all spatial points and all times
134
135 \begin{equation}
136 \begin{split}
137 \overline{cost\_ssh\_anom} & = \, \sum_{t} \sum_{i,j}
138 cost\_ssh\_anom(i,j,t)
139 \end{split}
140 \end{equation}
141
142 \end{enumerate}
143
144 \subsubsection{Flow chart}
145
146 \begin{verbatim}
147
148 cost_ssh
149 |
150 |- < compute nYears model mean >
151 |
152 |- < read nYears T/P mean >
153 | CALL COST_READTOPEXMEAN
154 |
155 |- < compute global T/P vs. model offset >
156 |
157 |- < compute cost_hmean >
158 | CALL COST_SSH_MEAN
159 |
160 |- < ... >
161
162 \end{verbatim}
163
164 \subsubsection{Weights}
165
166 \begin{itemize}
167 %
168 \item
169 All data are currently masked to zero where less than 13 depth levels,
170 mimicing no contribution for depth less than 1000m.
171 %
172 \item
173 $cosphi$ term in weights is set to 1.
174 %
175 \item
176 bad T/P and ERS-1/2 values are flagged $ \le \, -9990. $
177 %
178 \item
179 T/P and ERS-1/2 data $ \le \, 1.\exp^{-8}$ cm are flagged as bad values
180 %
181 \item
182 $wp$ is read from {\tt geoid\_errfile}
183 and $1/wp^2$ is pre-computed in {\tt ecco\_cost\_weights}
184 %
185 \end{itemize}
186
187 \paragraph{$wp$ for SSH mean misfit} ~
188
189 $1/wp^2$ is pre-computed in {\tt ecco\_cost\_weights}; \\
190 $wp$ is read from {\tt geoid\_errfile};
191
192 \paragraph{$wtp$ and $wers$ for SSH anomaly misfit} ~
193
194 $1/wtp^2$, $1/wers^2$ are pre-computed in {\tt ecco\_cost\_weights}; \\
195 %
196 \begin{itemize}
197 %
198 \item
199 $wtp$, $wers$ are read from single {\tt ssh\_errfile}
200 %
201 \item
202 both are converted to meters and halved \\
203 $ wtp \, \longrightarrow \, wtp \cdot 0.01 \cdot 0.5 $
204 %
205 \item
206 ERS error is set to T/P error + 5cm \\
207 $ wers \, = \, wtp \, + 0.5cm $
208 %
209 \end{itemize}
210
211 \subsubsection{Cost diagnostics}
212
213 \begin{itemize}
214 %
215 \item
216 Map out $ cost\_ssh\_mean(i,j) $
217 %
218 \item
219 Map out $ cost\_ssh\_anom(i,j,t) $ averaged over 1 month, i.e.
220 \[
221 \frac{1}{\text{monthly entries}} \sum_{t}^{monthly} cost\_ssh\_anom(i,j,t)
222 \]
223 %
224 \item
225 sum over daily entries and plot daily average as function of time. i.e.
226 \[
227 \frac{1}{\text{daily entries}} \sum_{i,j} cost\_ssh\_anom(i,j,t)
228 \]
229 \end{itemize}

  ViewVC Help
Powered by ViewVC 1.1.22