50 |
ln -sf ../build/mitgcmuv . |
ln -sf ../build/mitgcmuv . |
51 |
qsub job_ivy_llc540 |
qsub job_ivy_llc540 |
52 |
|
|
53 |
|
|
54 |
|
################## |
55 |
|
Rain correction factors |
56 |
|
Aiming for 1.5 +/1 1 mm/year barystatic sea level increase |
57 |
|
|
58 |
|
jra55 |
59 |
|
unadjusted sea level increase: 322.5 mm/yr |
60 |
|
correction needed: -321 mm/yr |
61 |
|
mean precip over ocean: 4.267e-8 m/s = 1346.6 mm/yr |
62 |
|
correction factor: (1346.6-321)/1346.6 = 0.7616 |
63 |
|
|
64 |
|
jra55do |
65 |
|
unadjusted sea level increase: 29.6 mm/yr |
66 |
|
correction needed: -28.1 mm/yr |
67 |
|
mean precip over ocean: 3.4788e-8 m/s = 1097.83 mm/yr |
68 |
|
correction factor: (1097.83-28.1)/1097.83 = 0.9744 |
69 |
|
|
70 |
|
eraxx |
71 |
|
unadjusted sea level increase: 13.1 mm/yr |
72 |
|
correction needed: -11.6 mm/yr |
73 |
|
mean precip over ocean: 3.8299e-8 m/s = 1208.62 mm/yr |
74 |
|
correction factor: (1208.62-11.6)/1208.62 = 0.9904 |