/[MITgcm]/MITgcm_contrib/high_res_cube/input/data.cal |
Parent Directory
|
Revision Log
|
Revision Graph
Links to HEAD: | (view) (download) (annotate) |
Sticky Tag: |
changing umask to 027 for group-readable changing monthly output to 30-day output
preparing cube77
preparing for cube76, 1979-2006 integration, same defaults as cube75 but using ERA40/ECMWF blend plus GPCP
preparing for cube75, the second ECCO2 blend solution
preparing for cube73
preparing for cube55
moving CalendarDumps from data and data_hr to data.cal updating output.txt for compatibility with most recent code
high_res_cube/*
use pkg/exf to read input files
This form allows you to request diffs between any two revisions of this file. For each of the two "sides" of the diff, select a symbolic revision name using the selection box, or choose 'Use Text Field' and enter a numeric revision.
ViewVC Help | |
Powered by ViewVC 1.1.22 |