1 |
% changes to ECCO2 website |
2 |
|
3 |
#benji |
4 |
|
5 |
- Some publications under 2008 were published in 2007: "Hill, 2007: A dynamicthermodynamic sea" |
6 |
|
7 |
- Products and Data Servers: |
8 |
-data1/cube and data1/eight are both referred to as PO.DAAC ftp server |
9 |
+"Diagnostics for CLIVAR/GODAE" includes web addresses without links |
10 |
(Could create readme.html instead of readme.txt) |
11 |
|
12 |
- Links lead user to filesystem directory index listings (such as Model-data comparisons)...pick out significant files or try to open links in the same black-background format and add index.htmls |
13 |
|
14 |
- Glossary (for acronyms used on the Perturbation Experiments Initial Conditions page, for instance) |
15 |
|
16 |
- Visualizations would be very useful...perhaps place a link to a visualization toolbox GUI .tar file near the OpENDAP link. Visualize changed boundary conditions. |
17 |
|
18 |
- Be able to start .mpg videos in the same window by clicking on them, instead of having to download them into a separate window. |
19 |
|
20 |
- Project Snapshots: Change Green <br> function to Green's function <br>; Add more than just one month or move elsewhere...There is nothing for May 2007 |
21 |
|
22 |
- People: In some browsers, one picture may move slightly upon mouseover; JPL people are separated |
23 |
|
24 |
- Link to .mpg from homepage gives error in IE, but not in Firefox |
25 |
|
26 |
- Give banner text more of a background because white text blends into sun |
27 |
|
28 |
- Button inconsistencies (& vs. and); ECCO2 Logo alt text is a bit of a misnomer for a link to ECCO(1) |
29 |
|
30 |
- Source code of ecco2.jpl.nasa.gov has seemingly extra // --> comments |
31 |
|
32 |
- Could not access password-protected mitgcm.org/ecco_wiki/index.php/Cube78 (the ECCO-Godae wiki someone else mentioned below) |
33 |
|
34 |
- Consider an example figure and then a link, "More figures..." |
35 |
|
36 |
|
37 |
+ Broken links: Related Links: SDSC Nuggets, Homepage imagemap Seasat |
38 |
Changed to jpl.nasa.gov/missions/missiondetails.cfm?mission=Seasat |
39 |
Removed ESDCD news, summer 2003 from Related Links. |
40 |
|
41 |
+ Some manuscripts and publications do not have links; missing space before doi in R. M. Ponte's first entry |
42 |
|
43 |
+ Meetings and Presentations: choose consistent Day, Month, Year MLA format |
44 |
|
45 |
+ Inconsistencies between ecco2.org and ecco2.jpl.nasa.gov (such as banner links) |
46 |
|
47 |
+ Links are unclear, so get rid of href="#" in the dependencies tree after clicking on Initial Conditions (IC); fix cubes 75 and 77 |
48 |
|
49 |
+ Typo in dependency tree ("horizontal" misspelled in legend) |
50 |
|
51 |
+ Cube43 to Cube44 is exactly the same as subsequent Cube43 to Cube45 |
52 |
|
53 |
+ Related Links: Get rid of x after 2006...Data Assimilation; inconsistency in whether date is part of link; Cube 23 says "but with reduce viscosity" |
54 |
|
55 |
# end_benji |
56 |
|
57 |
|
58 |
- video of rotating cube (gif rather than download mpg)? |
59 |
|
60 |
- presenting output from runs |
61 |
|
62 |
-> ECCO-Godae wiki |
63 |
|
64 |
- key time series (heat, mass, seaice) |
65 |
|
66 |
- individual sites for ECCO2 team members with results |
67 |
|
68 |
- set of standard plots |
69 |
|
70 |
- rename to "results and animations" |
71 |
|
72 |
- run descriptions: contents in a uniform table? |
73 |
e.g. (products/output/cube/cube1) |
74 |
|
75 |
- update run descriptions: cube 81 |
76 |
-> list of perturbation experiments |
77 |
|
78 |
- highlight OceanDIVA, and or OPeNDAP |
79 |
|
80 |
- information where data can be downloaded |
81 |
|
82 |
|
83 |
|
84 |
***** |
85 |
|
86 |
from Dimitris: |
87 |
|
88 |
add Laurent White |
89 |
laurentw@princeton.edu |
90 |
http://www.princeton.edu/~laurentw/ |
91 |
to http://ecco2.org/people/ |
92 |
|
93 |
maybe remove jim taft, move losch to were adcroft is ... |
94 |
|
95 |
possibly use bullets for meetings as is done for manuscripts |
96 |
|
97 |
meetings, add index.html's to multi-presentation meetings |
98 |
|
99 |
|
100 |
==================================== |
101 |
|
102 |
1. for the dependency tree, |
103 |
http://ecco2.jpl.nasa.gov/products/output/cube/ecco2_diagram/diagram.html |
104 |
fill in the "Text to come" with information from |
105 |
http://ecco2.jpl.nasa.gov/products/output/cube/ |
106 |
and |
107 |
http://ecco2.jpl.nasa.gov/data1/cube/readme.txt |
108 |
|
109 |
2. for the dependency tree, clicking on a particular integration should take one to location of model output, i.e., for cube37, it should point to: |
110 |
http://ecco2.jpl.nasa.gov/data1/cube/cube37/ |
111 |
|
112 |
3. for the initial conditions tree, |
113 |
http://ecco2.jpl.nasa.gov/products/output/cube/dependencies_tree.jpg |
114 |
there has to be a sense of how many years of integration each experiment |
115 |
involves. There is a typo for 76 it is blend 2 + 13 (not 3) years. |
116 |
|
117 |
5. need to update http://ecco2.jpl.nasa.gov/products/output/cube/ |
118 |
with more recent integrations. |
119 |
|
120 |
Eventually, I would like |
121 |
http://ecco2.jpl.nasa.gov/products/output/cube/ |
122 |
to be replaced by some directions to the various pages, i.e., |
123 |
http://ecco2.jpl.nasa.gov/data1/cube/readme.txt |
124 |
http://ecco2.jpl.nasa.gov/products/output/cube/ecco2_diagram/diagram.html |
125 |
http://ecco2.jpl.nasa.gov/products/output/cube/dependencies_tree.jpg |
126 |
one link for the existing content of the page |
127 |
http://ecco2.jpl.nasa.gov/products/output/cube/output.html |
128 |
http://ecco2.org/products/output/equiv/ |
129 |
http://ecco2.jpl.nasa.gov/products/output/gsop/ |
130 |
and so on and so forth, maybe with small pictures showing what each page means. |
131 |
|
132 |
http://ecco2.jpl.nasa.gov/products/output/cube/dependencies_tree.jpg |
133 |
to be renamed initial conditions. Also change so that position on page immediately gives some idea of integration time. |
134 |
|
135 |
Add explanations to arrows in |
136 |
http://ecco2.jpl.nasa.gov/products/output/cube/ecco2_diagram/diagram.html |
137 |
|
138 |
update menu for meetings to include all the ones that are in directory |
139 |
|
140 |
buttons at top to stay there while browsing to different years |
141 |
in meetings web site |
142 |
|
143 |
when going over MITgcm, it changes font size |
144 |
buttons have different amounts of shading on the sides |
145 |
|
146 |
add link to |
147 |
http://www.mit.edu/~mmazloff/current_research.html |
148 |
and also the "saucy" figure |
149 |
|
150 |
size of buttons may need to be readsuted a little bit, now that titles have changed |
151 |
|
152 |
5) the sides of some of the buttons are narrower, less shaded, than others. |
153 |
|
154 |
6) Depressed button is still not quite right. What do you think? Shall we try a slightly darker shade overall, i.e., less light. |
155 |
|
156 |
7) Also when we go over the buttons and they light up green, shall we have the one that is depressed also light-up green but in a depressed state, i.e., slightly darker and shaded sides reversed? |
157 |
|
158 |
add description of cubed sphere to web site, see e-mail to Victor, 8 march 2007 |
159 |
|
160 |
High Resoution -> High Resolution |
161 |
|
162 |
ASPERA with instructions |
163 |
RSYNC Victor/Jerry |
164 |
|
165 |
formats netcdf or software for on-the-fly transformation |
166 |
|
167 |
ACCESS call for ECCO2/PO.DAAC and for SCIFLOW |
168 |
look at February 16 call for ROSES FY07 |
169 |
|
170 |
move "other results and animations" under products and data servers and call it "visualization" |
171 |
|
172 |
Need to write text for "List of Global Cubed-Sphere (CS510) ECCO2 Solutions and Perturbation Experiments" in http://ecco2.jpl.nasa.gov/products/output/cube/ |
173 |
There was an old description on original page that I can use as a baseline but it will need to be modified to better explain the baseline to perturbation concept. |
174 |
|
175 |
replace rhoConst with actual value in description |
176 |
|
177 |
ECCO logo should point to ecco-group web site for both ecco2.jpl and ecco2.org, without opening new window. avoid opening new windows for any of the web sites |
178 |
why does ECCO2 banner move when we click it? |
179 |
button, can it have a depressed look when clicked, i.e., opposite shadows |
180 |
make search ECCO2 live, needs to be accessible outside JPL |
181 |
|
182 |
separate http://ecco2.org/products/index.html page |
183 |
transfer some of the other stuff to JPL and beautify |
184 |
populate http://ecco2.org/applications/ |
185 |
add description of Tong Lee's and Josh Willis' efforts to ECCO2 web site |
186 |
add 1/6th degree Arctic Ocean and Antarctic Ocean solutions to ECCO2 web site |
187 |
|
188 |
add short descriptions to blue buttons when you pass over them |