Parent Directory
|
Revision Log
|
Revision Graph
|
Patch
revision 1.4 by edhill, Thu Oct 9 04:19:19 2003 UTC | revision 1.5 by mlosch, Mon Apr 19 23:25:15 2004 UTC | |
---|---|---|
# | Line 258 c Week days. | Line 258 c Week days. |
258 | c Assume a model calendar having 12 months with thirty days each. | c Assume a model calendar having 12 months with thirty days each. |
259 | c Reference date is the first day of year 0 at 0am, and model | c Reference date is the first day of year 0 at 0am, and model |
260 | c day 1. | c day 1. |
261 | refdate(1) = 1 | refdate(1) = 00000101 |
262 | refdate(2) = 0 | refdate(2) = 0 |
263 | refdate(3) = 1 | refdate(3) = 1 |
264 | refdate(4) = 1 | refdate(4) = 1 |
|
ViewVC Help | |
Powered by ViewVC 1.1.22 |